The Erlang Map
used to compute blocking probability on a trunk group given load, capacity
DNHR assigns alternate paths to toll switches to minimize blocking probability
So, path depends on expected load which depends on the path selection!
How to deal with this:
- system of equations (Erlang Map)
- unique fixed-point solution (Erlang fixed point)